Installation Of Pipe Toro

How to installation/How To Install Toro 25 Pipes

1. Make sure that the cutter blades does not have irregularities and are properly sharpened; • Cut the tube perpendicular to its axis; • Check that the cutting section is perfectly flat and that there are no defects due to

nippers misuse.

2. Joints ends must be smooth and the edges carefullybevelled.

3. Mark with a pencil the depth on the pipe coupling (look at the following table "welding depth")

src = "https://image1ws.indotrading.com/productimages/co632/p226643/w300-h300/f4c00005-5daf-4136-b70c-d12dbe63aad3w.jpg"/>

4. Heat both elements to be jointed, inserting them in the appropriate matrices of the welder device. Melting temperature of 260 ° C should be. Wait for the due time the us indicated by the standard DVS 2207.

5. After a few seconds, pull out the pipe and the fittings and joint them immediately

6. Push the pipe without any rotation until it reaches the marked welding depth. Follow indications on cooling time according with Standard 2207 part. 11.

 

Welding Machine Pipes PPR Toro

Lihat Selengkapnya

Untuk keterangan lebih lanjut, silahkan download PDF ini :

Ulasan

/5
Ulasan
5
4
3
2
1

Foto dari Pembeli

Ulasan dari Pembeli

Filter
Semua
Dengan Foto
5
4
3
2
1
Request a Quote
Produk Siap di Pesan
Rp 0
1